注册并分享邀请链接,可获得视频播放与邀请奖励。

与「giga女战士」相关的搜索结果

giga女战士 贴吧
一个关键词就是一个贴吧,路径全站唯一。
创建贴吧
用户
未找到
包含 giga女战士 的内容
未来就应该有未来的样子!Giga Texas 已经动工,Terafab 将在这里诞生✨
Terafab approximate size comparison between Giga Texas, the Pentagon, Apple Park, and the Mall of America. There has never been a building this large. Elon Musk says it will be the most valuable building by far.
显示更多
0
140
3.7K
320
转发到社区
Terafab will be built in Grimes County, Texas In April, we broke ground on our research fab on the North Campus of Giga Texas – the precursor to Terafab. Both Tesla & SpaceX will need far more chips than current & future global production can supply. This is why we're building the largest chip manufacturing facility ever, with the goal of producing over 1 terawatt of compute per year The future is built in Texas
显示更多
0
1K
22.4K
2.7K
转发到社区
Cybercab employee rides at Giga Texas starting soon
Another massive new construction project underway at Giga Texas, this time on the very far W of the site across FM973 & near the Tesla Rd intersection. It looks like some of this is to move the rental equipment lot further away to allow a new graded area for a new construction project. What this is is still uncertain, but I do know changes in plans & permits have been underway as the entire Giga Texas site is seeing wide scale massive construction projects that are literally transforming what the overall campus visually looks like. We may hear more about all these projects at the 2nd Qtr Financial Results meeting on Wednesday … certainly the cash flow and Capital expenditures will be a topic of discussion, but you will already know all about that via the coverage of Giga Texas construction! 😎
显示更多
0
9
466
36
转发到社区
The Optimus factory at Giga Texas is growing faster, now 10 column grids wide (~400 to 450 feet in length, N-S or ~130 to 140 m) and growing to the N and S every day. On the S end, land reclamation work continues too, with more fill dirt, Geotextile membranes & the silt fences have been relocated further S along with more tree and vegetation removal. The full extent of the site and ultimate length of the building continues to evolve!
显示更多
0
36
904
80
转发到社区
Health and Benefits Week 3.0 at Giga Berlin
0
17
821
67
转发到社区
Every Elon Musk Product 1. Blastar (1984) 2. Zip2 (1995) 3. X. com (1999) 4. Tesla Roadster (2006) 5. Falcon 1 (2006) 6. Tesla Model S (2009) 7. Falcon 9 (2010) 8. Giga Fremont (2010) 9. Dragon 1 (2010) 10. Supercharging Network (2012) 11. Starship (2012) 12. Hyperloop (2013) 13. Dragon 2 (2014) 14. Tesla Model X (2015) 15. New Spacesuits (2015) 16. Starlink (2015) 17. Powerwall 1 (2015) 18. Giga Nevada (2016) 19. Tesla Model 3 (2016) 20. Powerwall 2 (2016) 21. Tesla Solar Roof (2016) 22. FSD (Full Self-Driving) (2016) 23. Tesla Semi (2017) 24. Tesla Roadster 2.0 (2017) 25. Tesla Solar Panels (2017) 26. Giga New York (2017) 27. Neuralink (2017) 28. Not-a-Flamethrower (2018) 29. Falcon Heavy (2018) 30. Giga Shanghai (2019) 31. Tesla Cybertruck (2019) 32. Tesla Cyberquad (2019) 33. Tesla Model Y (2019) 34. Tesla Megapack (2019) 35. Tesla Insurance (2019) 36. 4680 Cells (2020) 37. Short Shorts (2020) 38. Tesla Optimus (2021) 39. Giga Berlin (2022) 40. Prufrock II (2022) 41. Burnt Hair Perfume (2022) 42. Giga Texas (2022) 43. Powerwall 3 (2023) 44. Tesla Dojo (2023) 45. Giga Mexico (2023) 46. Grok (2023) 47. Cybercab (2024) 48. Robovan (2024) 49. Tesla Diner (2025) 50. Grok 4 (2025) 51. Grok Imagine (2025) 52. Grokipedia (2025)
显示更多
0
7
57
11
转发到社区
INSANE Drone Flyover of Tesla Giga Texas! I flew my FPV drone right over Tesla’s massive Gigafactory in Texas and captured epic aerial views of the factory. The sheer size of this place is mind-blowing! Watch the full flyover and see why Giga Texas is one of the biggest factories in the world. Drone footage shot on @antigravity_HQ  A1 Drone Purchase below
显示更多
0
26
258
46
转发到社区
The Optimus Factory at Giga Texas continues to see quick installation and assembly of steel on the growing superstructure, now 8 column grids “long” and nearly as wide as the final perimeter grade beam. GeoPier work on the south end continues as the prerequisite for footing construction. Footings are nearly complete not eh entire north end and on the south end, the foundation is reaching into the newly reclaimed land, which will further lengthen the building, inching closer to the Central Campus Support group of facilities which includes the Battery Cathode, Die Shop and Cortex 2 facilities.
显示更多
0
7
307
35
转发到社区