注册并分享邀请链接,可获得视频播放与邀请奖励。

与「VoltageUp_Monthly」相关的搜索结果

VoltageUp_Monthly 贴吧
一个关键词就是一个贴吧,路径全站唯一。
创建贴吧
用户
未找到
包含 VoltageUp_Monthly 的内容
━━━━━━━━━━━ Voltage Up! Monthly⚡️ ━━━━━━━━━━━ 「Voltage」Special Performance Movie (YouTube ver.) #ITZY# #Voltage# #VoltageUp_Monthly#
显示更多
0
34
8.6K
1.4K
转发到社区
━━━━━━━━━━━ Voltage Up! Monthly⚡ ━━━━━━━━━━━ 『Voltage』VLOG #ITZY# #Voltage# #VoltageUp_Monthly#
0
43
8.9K
1.4K
转发到社区
━━━━━━━━━━━ Voltage Up! Monthly⚡️ ━━━━━━━━━━━ 「Voltage」Relay Dance (Short ver.) #ITZY# #Voltage# #VoltageUp_Monthly#
0
22
5.1K
860
转发到社区
━━━━━━━━━━━ Voltage Up! Monthly⚡ ━━━━━━━━━━━ 「Voltage」Special Dance Clip #ITZY# #Voltage# #VoltageUp_Monthly#
0
64
9.5K
1.5K
转发到社区
━━━━━━━━━━━ 📣「Voltage Up! Contest」詳細発表!⚡ ━━━━━━━━━━━ 期間:04.28(木)〜05.08(日) ”#Voltage# Up!”した瞬間をSNSに投稿✨ (ダンス/歌/写真など なんでもOK!) 抽選で限定プレゼントが当たります!🎁 ▼詳細 #ITZY# #VoltageUp_Monthly#
显示更多
0
10
3.9K
557
转发到社区
━━━━━━━━━━━ Voltage Up! Monthly⚡ ━━━━━━━━━━━ 「Voltage」Special Performance Movie (from『Voltage』Release event) #ITZY# #Voltage# #VoltageUp_Monthly#
显示更多
0
46
8.6K
1.5K
转发到社区
━━━━━━━━━━━━━━━━━ 📣Voltage Up! Monthly 実施決定!⚡ ━━━━━━━━━━━━━━━━━ 「Voltage Up! Contest」も開催決定🎶 (Coming soon) お楽しみに…💕 #ITZY# #Voltage# #VoltageUp_Monthly#
显示更多
0
88
6.4K
1.2K
转发到社区
SpaceX has just unveiled a massive new $50 billion Supercomputing Campus that they want to build in Cochise County, Arizona. All info: • Up to 6 GW across the 9 supercomputing buildings • Construction starts 2027 • Size of each supercomputing building: ~493,000 square feet. • Total supercomputing building space: 4.44 million square feet, excluding support facilities. • SSVEC residential customers are projected to see electricity bill reductions of 10–40%. • Up to 24 GWh of grid-connected battery storage to provide backup power, stabilize the regional electric grid, support local voltage, and absorb fluctuations in electricity demand. Among the largest planned battery installations in the United States. • Additional solar generation in the region is planned to supply renewable electricity during the day and reduce demand on the local grid. • No dedicated on-site power plant or fuel storage yard is planned. • Each supercomputing building will have 10 MW of natural-gas-powered standby generation for critical equipment, operating only during utility outages and periodic testing. • No gas turbines will be installed at the site. • SpaceX plans to fund $3.6 billion in grid infrastructure upgrades, transferred to AEPCO at no cost to its members. • Up to $260 million annually in additional benefits for cooperative members at full buildout, on top of residential bill reductions. • Up to $200 million annually for cooperative members statewide, in addition to SSVEC benefits. • The supercomputers will use dry cooling with a closed-loop water circulation system rather than evaporative cooling. • SpaceX projects zero ongoing industrial water consumption. • The cooling system will be filled initially, with water reused for up to 10 years. • SpaceX estimates annual water usage equivalent to approximately 20–30 Arizona residential homes. • Projected annual water use would be less than 2.5% of a single center-pivot irrigation system's annual consumption. • Permanent jobs: Approximately 1,000. • Construction jobs: Approximately 5,500. • Annual property tax revenue: Up to $103 million in estimated new annual revenue. • Regional economic benefits: SpaceX says its investment will support public education, infrastructure, essential local services, and economic development. • Local suppliers: SpaceX is encouraging suppliers to participate in construction and development of the campus. • Noise mitigation: Equipment will be positioned away from neighboring properties where possible, with setbacks and additional screening to reduce noise. • Nighttime lighting: Outdoor lighting will remain off unless work is underway, with active lights shielded and directed downward. • Dark-sky protection: The campus will comply with Cochise County's dark-sky requirements to limit light pollution. • Nighttime construction: SpaceX says it will seek waivers when nighttime construction lighting is necessary. • Wildlife protection: The campus is being designed with consideration for the region's sandhill crane wintering habitat. This campus's purpose is to build one of the world's most advanced AI supercomputing campuses to train SpaceX's superintelligence models and support scientific and engineering breakthroughs. Learn more:
显示更多
0
20
210
14
转发到社区
I put a whole C. elegans nervous system on BNB Chain as a deterministic spiking network that runs 100% inside one verified smart contract. 302 neurons, 5,144 synapses, Q20 fixed-point — every voltage, spike and turn is on-chain state. Live on mainnet right now: tick 5 and climbing, connRoot 0x38dc5c12…4d8cac, at 0x49E89C58bA3b1f4BEe9a9CFdbC00628cB33fC6A3. What it is not: not an electrophysiology clone — the chemical synapses are a modeling abstraction, not measured biology; the steering toward food is a hand-written controller running on a connectome-shaped substrate, not something that emerged from the wiring; and it is not a token — there is nothing to buy. Along the way I found and fixed a real bug: the synapse direction was transposed, so my Python spec and the contract had agreed on a mirrored network. I corrected the build and re-seeded a fresh, direction-correct brain from a deterministic genesis, with connRoot == keccak256(blob) verified on-chain. Read / reproduce it: Live dashboard (read-only): JSON API: Verified source: Code + spec:
显示更多
0
14
30
8
转发到社区
Dyson came out with its first travel hair dryer, the Supersonic Travel. At 0.7lbs, this hair dryer features the same heat control as the standard Supersonic and universal voltage for travel. Check it out now
显示更多