注册并分享邀请链接,可获得视频播放与邀请奖励。

与「Supercopa」相关的搜索结果

Supercopa 贴吧
一个关键词就是一个贴吧,路径全站唯一。
创建贴吧
用户
未找到
包含 Supercopa 的内容
#插件推荐# 超级复制 SuperCopy ,在禁止复制、禁止右键、禁止选择的站点,一键复制,一键粘贴,一键选择,启用右键,启用复制,启用选择,启用粘贴。 直达传送门:
显示更多
0
11
269
67
转发到社区
SpaceX has just unveiled a massive new $50 billion Supercomputing Campus that they want to build in Cochise County, Arizona. All info: • Up to 6 GW across the 9 supercomputing buildings • Construction starts 2027 • Size of each supercomputing building: ~493,000 square feet. • Total supercomputing building space: 4.44 million square feet, excluding support facilities. • SSVEC residential customers are projected to see electricity bill reductions of 10–40%. • Up to 24 GWh of grid-connected battery storage to provide backup power, stabilize the regional electric grid, support local voltage, and absorb fluctuations in electricity demand. Among the largest planned battery installations in the United States. • Additional solar generation in the region is planned to supply renewable electricity during the day and reduce demand on the local grid. • No dedicated on-site power plant or fuel storage yard is planned. • Each supercomputing building will have 10 MW of natural-gas-powered standby generation for critical equipment, operating only during utility outages and periodic testing. • No gas turbines will be installed at the site. • SpaceX plans to fund $3.6 billion in grid infrastructure upgrades, transferred to AEPCO at no cost to its members. • Up to $260 million annually in additional benefits for cooperative members at full buildout, on top of residential bill reductions. • Up to $200 million annually for cooperative members statewide, in addition to SSVEC benefits. • The supercomputers will use dry cooling with a closed-loop water circulation system rather than evaporative cooling. • SpaceX projects zero ongoing industrial water consumption. • The cooling system will be filled initially, with water reused for up to 10 years. • SpaceX estimates annual water usage equivalent to approximately 20–30 Arizona residential homes. • Projected annual water use would be less than 2.5% of a single center-pivot irrigation system's annual consumption. • Permanent jobs: Approximately 1,000. • Construction jobs: Approximately 5,500. • Annual property tax revenue: Up to $103 million in estimated new annual revenue. • Regional economic benefits: SpaceX says its investment will support public education, infrastructure, essential local services, and economic development. • Local suppliers: SpaceX is encouraging suppliers to participate in construction and development of the campus. • Noise mitigation: Equipment will be positioned away from neighboring properties where possible, with setbacks and additional screening to reduce noise. • Nighttime lighting: Outdoor lighting will remain off unless work is underway, with active lights shielded and directed downward. • Dark-sky protection: The campus will comply with Cochise County's dark-sky requirements to limit light pollution. • Nighttime construction: SpaceX says it will seek waivers when nighttime construction lighting is necessary. • Wildlife protection: The campus is being designed with consideration for the region's sandhill crane wintering habitat. This campus's purpose is to build one of the world's most advanced AI supercomputing campuses to train SpaceX's superintelligence models and support scientific and engineering breakthroughs. Learn more:
显示更多
0
20
210
14
转发到社区
Development of the Starbase supercompute site is creating an opportunity to address decades of environmental neglect. Portions of the property were used for unauthorized dumping dating back to the 1960s. We're undertaking cleanup efforts to remove decades of accumulated debris, including scrap metal, discarded appliances, old tanks, fiberglass insulation, construction materials, and thousands of illegally dumped tires
显示更多
0
494
14.4K
1.6K
转发到社区
From the Rio Grande Valley, TX to Cochise County, AZ, we’re building more than supercomputers. We’re creating jobs, investing in critical infrastructure, expanding local tax bases, and working alongside communities to build a future that benefits the people who live there →
显示更多
0
169
6.5K
667
转发到社区
Elon Musk, I decided to bring Jensen Huang onto the team because you simply do not pass up a once-in-a-generation opportunity to recruit the greatest compute architect on Earth. When it comes to building massive AI infrastructure, designing next-generation silicon, and scaling hardcore engineering at extreme velocity, nobody operates on Jensen’s level, and his vision for accelerated computing aligns 100% with what we are building across xAI, Tesla, and SpaceX. Bringing his unmatched expertise in-house to merge with our Dojo supercomputers, Grok clusters, and real-world robotics will compress years of innovation into months—and when legacy boards hesitate on true greatness, I am always going to bet big on the best talent in the world.
显示更多
0
5
42
15
转发到社区
It’s not that supercomputer data centers are not in high demand, as they definitely are. However, getting money to build complex hardware systems with massive power, cooling & networking is not the same as doing it. SpaceX has a super cracked team that is outperforming the rest of the world by an order of magnitude in mass to orbit and even we find it very difficult!
显示更多
0
375
11.3K
736
转发到社区
“Superconductors do not follow Joule’s law, but can we make a superconductor function like a diode?” asks Prof. Zhang Ding. He explores charging heat, superconducting efficiency, and his lab’s quantum superconducting diode at liquid nitrogen temperatures.
显示更多
Elon Musk has helped build some of the most ambitious engineering projects of the modern era. 🚗 Tesla EVs, Cybertruck, Semi, Optimus & Robotaxi 🚀 Falcon 9, Falcon Heavy, Dragon, Starship & Super Heavy 🛰️ Starlink & Direct-to-Cell 🧠 Neuralink brain-computer interfaces 🚇 The Boring Company’s underground Loop 🤖 Grok & large-scale AI infrastructure 🔋 Powerwall, Megapack & Supercharger network From electric vehicles and energy systems to reusable rockets, satellites, AI and brain-computer interfaces. The scale is hard to comprehend.
显示更多
0
34
353
54
转发到社区
Sign up to hear the latest on @bot! I'll be sharing some of the ways proactivity has supercharged @bot, should be a good time :)
0
30
520
16
转发到社区